Syria Electricity Transmission Network

Syria Electricity Transmission Network

Infrastructure Capacity & Connection Analytics

Enhanced Data Version

Total Lines

-

400 kV Backbone

-

Total Installed Capacity

~3,400 MW*

*Select nodes for specifics

Active Interconnections

-

Node Info

Network Components

400 kV (Main Transit)
230 kV (Regional Distribution)
Power Generation Hub
Regional Load Centre

Technical Insight

Backbone Connectivity

The 400 kV circuit facilitates major interconnections with Jordan (Amman-Deir Ali) and Turkey (Birecik-Aleppo). This transit capacity is vital for frequency stability across the Levant.

Fuel Dependency

The thermal plants (Deir Ali, Zayzoun) are gas-dependent. Disruption in gas supply directly affects the generation available to Damascus and Aleppo, leading to load-shedding cycles.

✨ AI Strategic Analysis