Infrastructure Capacity & Connection Analytics
Total Lines
-
400 kV Backbone
-
Total Installed Capacity
~3,400 MW*
*Select nodes for specifics
Active Interconnections
-
Backbone Connectivity
The 400 kV circuit facilitates major interconnections with Jordan (Amman-Deir Ali) and Turkey (Birecik-Aleppo). This transit capacity is vital for frequency stability across the Levant.
Fuel Dependency
The thermal plants (Deir Ali, Zayzoun) are gas-dependent. Disruption in gas supply directly affects the generation available to Damascus and Aleppo, leading to load-shedding cycles.