SRC-344
UCC Holding, 'UCC Holding, a subsidiary of Power International Holding, leads consortium: Signs strategic agreements with Siemens Energy for Syria power projects', press release, Berlin, carried by Zawya
مضمون هذا الصفّ بلغته الأصلية؛ وأسماء الحقول وشروحها بالعربية.
- المعرّف
- الوثيقة
- UCC Holding, 'UCC Holding, a subsidiary of Power International Holding, leads consortium: Signs strategic agreements with Siemens Energy for Syria power projects', press release, Berlin, carried by Zawya
- أين توجد
- https://www.zawya.com/en/press-release/companies-news/ucc-holding-a-subsidiary-of-power-international-holding-leads-consortium-352732; محفوظة في أرشيف المؤلف; text at محفوظة في أرشيف المؤلف
- نوع الوثيقة
- Counterparty's own press release carried by a wire
- درجة الدليل
- 5(بيان صحفي مؤسسي أو إعلام رسمي، أي جهة تتحدث عن نفسها)
- تاريخ النشر
- 2026
- أول مرة فتحها المؤلف
- 2026-08-22
- سجل الاسترجاع
- HTML archived and converted to text 22 August 2026
- ما يعتمد عليه الكتاب فيها
- TR-011; issue 56; the transaction taxonomy
- إلى أي حد قُرئت
- READ_IN_PART(بُلغ جزء منها؛ ويسمّي الصفّ الجزء الذي قُرئ)
سجلّ التعديلات
يبقى السجل يتغيّر بعد أن يثبت الكتاب في الطباعة. وكل قيد أدناه أُضيف إلى هذا الصفّ بالترتيب المبيَّن، الأقدم أولاً.
- RETRIEVED AND READ 22 AUGUST 2026. IT RECORDS A STEP NO REGISTER ROW HOLDS AND ITS PRECISE NATURE IS THE POINT. VERBATIM: 'an international consortium led by UCC Holding, through its subsidiary UCK Power, signed TWO MANUFACTURING SLOT RESERVATION AGREEMENTS with Siemens Energy. The agreements cover the supply of combined cycle power packages for the Zayzoun and Deir Azzour power plant projects in Syria, each with a planned capacity of approximately 1,000 MW, and the securing of dedicated manufacturing capacity for critical components, including advanced gas turbines and associated systems.' A MANUFACTURING SLOT RESERVATION IS NOT AN ENGINEERING AWARD, NOT A CONSTRUCTION START AND NOT FINANCIAL CLOSE. It is a reservation of a turbine maker's production capacity, which is a real and dated commercial step and sits outside the sequential ladder in سجلّ عمل داخلي; the nearest defined stage, ENGINEERING_AWARD at order 13, requires a contractor appointed with scope, which this is not. THIS IS EXACTLY THE ASYMMETRY ISSUE 56 IS ABOUT: a reader told that turbines have been ordered will hear construction, and what has happened is that slots in a factory queue have been booked. Prose names the instrument. SIGNED IN BERLIN IN THE PRESENCE OF THE HEAD OF STATE: the release names H.E. Ahmad Al Sharaa, President of the Syrian Arab Republic; H.E. Asaad Al Shaibani, Minister of Foreign Affairs and Expatriates; H.E. Mohammad Al Bashir, Minister of Energy; Moutaz Al-Khayyat, Chairman of UCC Holding; Ramez Al Khayyat, President and Group CEO; and Christian Bruch, CEO and President of Siemens Energy. STATUS READ_IN_PART: the opening and the terms of the agreements are read; the remainder of the release, including any date on its face, is not, and THE DATE IS NOT ESTABLISHED. Zawya carries it as a press release without a visible dateline in the extracted text, so no date is recorded here and none may be printed until one is found. That is retrieval owed.