rayanazhari.co.ukعن الكتابENع
ريان أزهري.
سجل الأدلة لكتاب تمويل إعادة إعمار سورية

المصادر

SRC-795

World Bank, Project Appraisal Document on a proposed grant in the amount of SDR 14.5 million (US$20 million equivalent) to the Syrian Arab Republic for a Syria Public Financial Management Capacity Strengthening Project, Report No. PADHI01267, 20 February 2026

ماذا تعني هذه الحقول

مضمون هذا الصفّ بلغته الأصلية؛ وأسماء الحقول وشروحها بالعربية.

ما يقوم على هذا المصدر

الفصول التي يسندها (1): الفصل الخامس

لا يستشهد به أي ادّعاء بمعرّفه.

كيف يُحسب هذا

حُجب من هذه الصفحة اقتباسان حرفيان من الوثيقة المحال إليها. اتبع الإحالة لقراءته في مصدره.

المعرّف
الوثيقة
World Bank, Project Appraisal Document on a proposed grant in the amount of SDR 14.5 million (US$20 million equivalent) to the Syrian Arab Republic for a Syria Public Financial Management Capacity Strengthening Project, Report No. PADHI01267, 20 February 2026
أين توجد
World Bank documents API listing for P512516 (محفوظة في أرشيف المؤلف, Project Appraisal Document, 2026-02-20); text held at محفوظة في أرشيف المؤلف
نوع الوثيقة
Multilateral institution project document
درجة الدليل
2
(قانون نافذ أو تنظيم رسمي أو حكم قضائي أو مجموعة بيانات رسمية أو حساب مدقَّق أو عقد منفَّذ أو وثيقة تمويل معتمدة)
تاريخ النشر
2026-02-20
أول مرة فتحها المؤلف
2026-10-16
سجل الاسترجاع
Retrieved 16 October 2026, HTTP 200, 159,157 bytes (محفوظة في أرشيف المؤلف section 4), SHA-256 prefix b34cd64fc4b69dda. Read at the cover and paragraphs 2 to 6 (VERIFY_A1_A3) and at paragraph 4, 18 October 2026.
ما يعتمد عليه الكتاب فيها
Chapter 5 v80 l.153 (D-304 item 9 A1)
إلى أي حد قُرئت
READ_IN_PART
(بُلغ جزء منها؛ ويسمّي الصفّ الجزء الذي قُرئ)

سجلّ التعديلات

يبقى السجل يتغيّر بعد أن يثبت الكتاب في الطباعة. وكل قيد أدناه أُضيف إلى هذا الصفّ بالترتيب المبيَّن، الأقدم أولاً.

  1. READ AFTER THIS BOOK'S CLOSING DATE, on 16 October 2026; the prose dates it. Cover: "Report No: PADHI01267", "FEBRUARY 20, 2026". Paragraph 4: the PID's sentence word for word, "[quotation withheld, 24 words; follow the citation]". It also reprints the Macro-Fiscal Assessment's budgeted deficit and debt figures (VERIFY_A1_A3 section 3.3); that the 5 derives from the Assessment's 2.5 is unestablished and the Bank does not say.
  2. D-315 closing pass (K05), 18 October 2026: LIFTED, 18 October 2026: as SRC-794, the bar "[quotation withheld, 10 words; follow the citation]" is lifted by the closing date of 18 October 2026 (D-315, LABELS #31); the reading stays dated 16 October 2026.
  3. 20 OCTOBER 2026 (article 14 revision, D-322; R11): READ WHOLE. Described in the article as the World Bank's own appraisal published on its documents site (the author's decision; its cover marking is not raised). Para 9: the procurement legal framework 'lacks provisions on key aspects such as transparency, conflict of interest, independent complaint mechanisms, value for money'; para 76 names 'the Recipient's Uniform System of Contracts Law No. 51 issued in 2004'; para 6 (rapid assessments) 'transaction processing is mainly manual/paper-based'; SORT 'Institutional Capacity for Implementation and Sustainability: High', 'Fiduciary: High'; para 16 indicators 'calibrated to the current administration's absorptive capacity'; 60 certified professionals and a portal publishing 70% of opportunities and awards by December 2028. Para 96's 'no official overarching recovery plan' predates the Statement (SRC-815) and is used only with its date.