SRC-538
International Renewable Energy Agency, IRENASTAT, 'Electricity capacity statistics by Country/area, Technology, Grid connection and Year', table C-ELECCAP (Country_ELECCAP_2026_H1), last updated 16 April 2026 on its own information block
مضمون هذا الصفّ بلغته الأصلية؛ وأسماء الحقول وشروحها بالعربية.
حُجب من هذه الصفحة اقتباس حرفي واحد من الوثيقة المحال إليها. اتبع الإحالة لقراءته في مصدره.
- المعرّف
- الوثيقة
- International Renewable Energy Agency, IRENASTAT, 'Electricity capacity statistics by Country/area, Technology, Grid connection and Year', table C-ELECCAP (Country_ELECCAP_2026_H1), last updated 16 April 2026 on its own information block
- أين توجد
- https://pxweb.irena.org/pxweb/en/IRENASTAT/IRENASTAT__Power%20Capacity%20and%20Generation/Country_ELECCAP_2026_H1_v-PX%201.px/; محفوظة في أرشيف المؤلف and .txt; query and results at سجلّ عمل داخلي, سجلّ عمل داخلي and .px; table metadata at سجلّ عمل داخلي
- نوع الوثيقة
- Official statistical database of an intergovernmental agency
- درجة الدليل
- 2(قانون نافذ أو تنظيم رسمي أو حكم قضائي أو مجموعة بيانات رسمية أو حساب مدقَّق أو عقد منفَّذ أو وثيقة تمويل معتمدة)
- تاريخ النشر
- 2026-04-16
- أول مرة فتحها المؤلف
- 2026-09-11
- سجل الاسترجاع
- Selection page, table metadata and a Syria query archived 11 September 2026 in two output formats
- ما يعتمد عليه الكتاب فيها
- Chapter 8 line 13: the 189 MW on-grid figure; the absence of source flags in the portal
- إلى أي حد قُرئت
- READ(فُتحت وقُرئت)
سجلّ التعديلات
يبقى السجل يتغيّر بعد أن يثبت الكتاب في الطباعة. وكل قيد أدناه أُضيف إلى هذا الصفّ بالترتيب المبيَّن، الأقدم أولاً.
- RETRIEVED AND READ 11 SEPTEMBER 2026, AQ-73 B9. Information block: 'Latest update 4/16/2026', unit MW, source 'IRENA (2026), Renewable Capacity Statistics 2026'; one general footnote ending '2024 electricity generation is preliminary and not accurate at aggregate levels'; no country note. THE PORTAL SPLITS CAPACITY BY GRID CONNECTION, WHICH THE PRINTED EDITIONS DO NOT. Syrian AR, Solar photovoltaic, OnGrid: 0.127 (2017), 1.377, 2.467, 11.522, 33.000, 58 (2022), 91 (2023), 106 (2024), 189.000 (2025). OffGrid: missing to 2021, then 249, 931, 1 500, 2 060. Total renewable OnGrid 2025: 1 745.705. NO o/u/e LETTERS, NO CELL NOTES in either output format. So the agency publishes 189 MW as Syrian on-grid solar for 2025; the printed edition does not, and there it is the difference of two tables. The API listing timestamps the table 17 April 2026 05:40; the table's own block says 16 April and that is the date taken. [row proposed as SRC-510 in سجلّ عمل داخلي; registered 12 September 2026]
- 18 October 2026 (CL2-B, closing pass 2, D-315) (STATUS E-2): THE TABLE THIS ROW CITES (Country_ELECCAP_2026_H1) RETURNED 404 ON 18 OCTOBER 2026; the portal now serves Country_ELECSTAT_2026_H2_PX, "[quotation withheld, 11 words; follow the citation]", https://pxweb.irena.org/api/v1/en/IRENASTAT/Power%20Capacity%20and%20Generation/Country_ELECSTAT_2026_H2_PX.px, queried for Syria 18 October 2026 19:14:35 UTC (محفوظة في أرشيف المؤلف, re-opened by me): Solar photovoltaic, Electrical Installed Capacity (MW), On-grid 58 (2022), 91 (2023), 106 (2024), 189 (2025); Off-grid 249, 931, 1500, 2060; no status flag on any cell. Chapter 8 l.13 holds unchanged.