International Renewable Energy Agency, IRENASTAT, 'Electricity capacity statistics by Country/area, Technology, Grid connection and Year', table C-ELECCAP (Country_ELECCAP_2026_H1), last updated 16 April 2026 on its own information block
1 verbatim quotation from the cited document is withheld from this page. Follow the citation to read it at the source.
Source ID
SRC-538
Citation
International Renewable Energy Agency, IRENASTAT, 'Electricity capacity statistics by Country/area, Technology, Grid connection and Year', table C-ELECCAP (Country_ELECCAP_2026_H1), last updated 16 April 2026 on its own information block
URL or path
https://pxweb.irena.org/pxweb/en/IRENASTAT/IRENASTAT__Power%20Capacity%20and%20Generation/Country_ELECCAP_2026_H1_v-PX%201.px/; research/AQ73_B9_irena_methodology/irenastat_ELECCAP_2026_H1_select_2026-09-11.html and .txt; query and results at irenastat_query_syria_2026-09-11.json, irenastat_ELECCAP_syria_2026-09-11.json and .px; table metadata at irenastat_api_ELECCAP_meta_2026-09-11.json
Type
Official statistical database of an intergovernmental agency
Hierarchy tier
2
Published
2026-04-16
Accessed
2026-09-11
Snapshot
Selection page, table metadata and a Syria query archived 11 September 2026 in two output formats
Claims
Chapter 8 line 13: the 189 MW on-grid figure; the absence of source flags in the portal
Status
READ
Version history
The register keeps changing after the book is fixed in print. Each entry below was added to this row in the order shown.
RETRIEVED AND READ 11 SEPTEMBER 2026, AQ-73 B9. Information block: 'Latest update 4/16/2026', unit MW, source 'IRENA (2026), Renewable Capacity Statistics 2026'; one general footnote ending '2024 electricity generation is preliminary and not accurate at aggregate levels'; no country note. THE PORTAL SPLITS CAPACITY BY GRID CONNECTION, WHICH THE PRINTED EDITIONS DO NOT. Syrian AR, Solar photovoltaic, OnGrid: 0.127 (2017), 1.377, 2.467, 11.522, 33.000, 58 (2022), 91 (2023), 106 (2024), 189.000 (2025). OffGrid: missing to 2021, then 249, 931, 1 500, 2 060. Total renewable OnGrid 2025: 1 745.705. NO o/u/e LETTERS, NO CELL NOTES in either output format. So the agency publishes 189 MW as Syrian on-grid solar for 2025; the printed edition does not, and there it is the difference of two tables. The API listing timestamps the table 17 April 2026 05:40; the table's own block says 16 April and that is the date taken. [row proposed as SRC-510 in audits/reports/AQ73_B9_irena_methodology_2026-09-11.md; registered 12 September 2026]
18 October 2026 (CL2-B, closing pass 2, D-315) (STATUS E-2): THE TABLE THIS ROW CITES (Country_ELECCAP_2026_H1) RETURNED 404 ON 18 OCTOBER 2026; the portal now serves Country_ELECSTAT_2026_H2_PX, "[quotation withheld, 11 words; follow the citation]", https://pxweb.irena.org/api/v1/en/IRENASTAT/Power%20Capacity%20and%20Generation/Country_ELECSTAT_2026_H2_PX.px, queried for Syria 18 October 2026 19:14:35 UTC (research/CLOSING2_STATUS_2026-10-18/ch08_09/dl/irena/SYR_H2_2026-10-18.json, re-opened by me): Solar photovoltaic, Electrical Installed Capacity (MW), On-grid 58 (2022), 91 (2023), 106 (2024), 189 (2025); Off-grid 249, 931, 1500, 2060; no status flag on any cell. Chapter 8 l.13 holds unchanged.