Sources

SRC-364

Syrian Arab Republic, Ministry of Electricity, 'Renewable Energy in Syria until the Year 2030', study document, 26 September 2021, 27 pages, as published on the website of the Ministry of Commerce of the People's Republic of China

4 verbatim quotations from the cited document are withheld from this page. Follow the citation to read them at the source.

Source ID
SRC-364
Citation
Syrian Arab Republic, Ministry of Electricity, 'Renewable Energy in Syria until the Year 2030', study document, 26 September 2021, 27 pages, as published on the website of the Ministry of Commerce of the People's Republic of China
URL or path
http://images.mofcom.gov.cn/sy/202112/20211213160212652.pdf; research/SRC-J2b_MOFCOM_renewable_energy_syria_2021.pdf; text at research/SRC-J2b_MOFCOM_renewable_energy_syria_2021.txt
Type
Government ministry study document
Hierarchy tier
2
Published
2021-09-26
Accessed
2026-08-22
Snapshot
PDF archived 22 August 2026, 27 pages, full text layer; PDF created 1 December 2021
Claims
Retrieval J2; equipment quality testing; a Ministry electricity series; Chapter 8 line 97 (bound, D-227)
Status
READ_IN_PART

Version history

The register keeps changing after the book is fixed in print. Each entry below was added to this row in the order shown.

  1. "[quotation withheld, 628 words; follow the citation]""[quotation withheld, 8 words; follow the citation]""; the document reads ""[quotation withheld, 12 words; follow the citation]""[quotation withheld, 4 words; follow the citation]"
  2. D-227 (Chapter 8 v59), 24 September 2026 (N-1 of audits/reports/d226_ch08_v58_retest_2026-09-24.md): Section Six B, 'Projects with the Private Sector on the Basis of Power Purchase Agreements' (PDF pages 9 and 10): under Article 28 of the Electricity Law, with feed-in tariffs, 157 photovoltaic projects licensed (117 MW), of which 72 (19 MW) implemented, and 9 wind projects licensed (35 MW), of which one of two turbines (5 MW) implemented; under Article 30, negotiations for 100 MW at Adra, 100 MW at Hassia and 300 MW elsewhere, 'all of which are photovoltaic power plants on the basis of power purchase agreements'. So Chapter 8's sentence on the Syrian-Turkish Energy instrument is bounded to the transactions the chapter sets out.
  3. D-227 (Chapter 8 v59 review, B-2/B-3), 24 September 2026 (audits/reports/d227_ch08_v59_diff_review_2026-09-24.md): Section Six B read at the PDF, pages 9 and 10, on 24 September 2026; the 'project inventory … not' read clause is SUPERSEDED for Six B. Six B also records that the Article 30 projects are 'not subject to feed-in tariffs', that coordination with the UNDP office is being made to help prepare rulebooks for two plants of /50/ photovoltaic megawatts at Harran Al-Awamid and /50/ at Qutaineh 'on the basis of power purchase agreements', and a locally manufactured wind turbine 'with a capacity of /7/ megawatts'. The '157 photovoltaic projects' of the D-227 block reads the document's '/157/ projects' in its photovoltaic context.