Sources

SRC-699

World Bank, Implementation Status and Results Report, Syria Health System Recovery and Strengthening Project (P513704), sequence 1, ISR08669, archived 12 September 2026

Source ID
SRC-699
Citation
World Bank, Implementation Status and Results Report, Syria Health System Recovery and Strengthening Project (P513704), sequence 1, ISR08669, archived 12 September 2026
URL or path
World Bank documents API, search.worldbank.org/api/v3/wds?projectid=P513704 (research/CLOSING_STATUS_2026-09-28/wds_P513704.json); research/CLOSING_STATUS_2026-09-28/WB_P513704_ISR_2026-09-12.pdf and .txt
Type
Financier's own implementation status report
Hierarchy tier
1
Published
2026-09-12
Accessed
2026-09-28
Snapshot
Retrieved 28 September 2026 by the closing pass's status limb (audits/reports/CLOSING_status_2026-09-28.md section 2.2, TR-003a); 8 pages; opened again 29 September 2026 for the CL-A drafting.
Claims
TR-003a stage FINANCIAL_CLOSE (D-250 item 3); Chapter 10 line 41 and Chapter 11 lines 50, 59 and 67 (closing pass)
Status
READ

Version history

The register keeps changing after the book is fixed in print. Each entry below was added to this row in the order shown.

  1. Section 7.2 Disbursements (by loan): 'IDA-E6650 Effective 75.00 74.90 0.00 0.00 74.90 0.00 0%'. Section 7.3 Key Dates: 'IDA-E6650 Effective 23-Apr-2026 19-May-2026 02-Sep-2026 30-Jun-2029 30-Jun-2029' (approval, signing, effectiveness, original and revised closing). Page 2: 'Project effectiveness conditions have been met.' Signed and effective with nil disbursed: FINANCIAL_CLOSE on the rule applied to TR-001 and TR-005, not FIRST_DISBURSEMENT. The IDA statement at 31 August 2026 (SRC-510) still shows this grant 'Signed', because it became effective on 2 September; the statement's next snapshot was not online on 28 September 2026.