Sources

SRC-747

General Company for Phosphate and Mines (الشركة العامة للفوسفات والمناجم), internal tender announcements for producing phosphate concentrate at blocks 2 and 1 of the Abtar South mine, Tadmur, October and December 2023, as captured by the Internet Archive

Source ID
SRC-747
Citation
General Company for Phosphate and Mines (الشركة العامة للفوسفات والمناجم), internal tender announcements for producing phosphate concentrate at blocks 2 and 1 of the Abtar South mine, Tadmur, October and December 2023, as captured by the Internet Archive
URL or path
https://gecopham.sy/wp-content/uploads/2023/12/Scan40001.pdf (capture 20240714101440, SHA-256 bb2d1238...45a2); https://gecopham.sy/wp-content/uploads/2023/12/Scan4.pdf (20241208165558, SHA-256 7a6203a8...6081); held research/CH9_ARCHIVE_2026-09-28/closing/pdf/ and verify/g1_p1.png, g1_p3.png, g2_p1.png, g2_p3.png
Type
Company tender document, archived
Hierarchy tier
4
Published
2023-10 and 2023-12 (days handwritten)
Accessed
2026-09-28
Snapshot
Fetched 28 September 2026 from the Wayback Machine; pages 1 and 3 of each read at the image
Claims
CH9 v36 line 141 (named as a class: 'the phosphate company's production targets for single blocks of one mine')
Status
READ_IN_PART

Version history

The register keeps changing after the book is fixed in print. Each entry below was added to this row in the order shown.

  1. Verbatim, block 2, p1: 'تعلن الشركة العامة للفوسفات والمناجم عن رغبتها بإجراء إعلان مناقصة داخلي لاعمال كشف وانتاج ( كشف كمية /١٣٥٠٠٠٠/م٣ شبكي لانتاج كمية /٤٥٠٠٠٠/ طن فوسفات مركز من البلوك /٢/ من منجم جنوب الابتر'; p3: 'الكمية الشهرية :٤٥٠٠٠ طن فوسفات مركز'; 'الكمية اليومية /١٥٠٠/ طن ويحق للشركة زيادة أو إنقاص هذه الكميات بنسبة ٢٥٪ حسب متطلبات التسويق'. Block 1: 375,000 tonnes over ten months, 1,250 a day. The letterhead still reads وزارة النفط والثروة المعدنية. CONTRACTOR TARGETS FOR TWO BLOCKS, NOT ACHIEVED OUTPUT; the p1 sums are initial bid guarantees, not contract values; no figure is printed.