Syrian Petroleum Company, reservoir-study tender for the Abu Rabah field, file 122/2024, Appendix D, as captured by the Internet Archive
Source ID
SRC-748
Citation
Syrian Petroleum Company, reservoir-study tender for the Abu Rabah field, file 122/2024, Appendix D, as captured by the Internet Archive
URL or path
https://spc.sy/support_2018/spec/122-2024-d.pdf (capture 20241108214041, SHA-256 50c14674...6406; identical capture 11 November 2024); held research/CH9_ARCHIVE_2026-09-28/closing/pdf/ and verify/abu_p3.png, abu_p4.png
Type
Company tender document, archived
Hierarchy tier
4
Published
2024
Accessed
2026-09-28
Snapshot
Fetched 28 September 2026 from the Wayback Machine; pages 3 and 4 read at the image
Claims
CH9 v36 line 141 (named as a class: 'one gas field's history')
Status
READ_IN_PART
Version history
The register keeps changing after the book is fixed in print. Each entry below was added to this row in the order shown.
Verbatim, p3: 'The Abu Rabah field was discovered in 1997 and began production in 2008. It is a gas reservoir from the Kurachine Dolomite formation, specifically from the C2 D1 strata.'; 'A total of 27 wells have been drilled in the Abu Rbah Field Development Area', each with a production date from Dec/2008 to Jul/2022; p4: the study is 'to recalculate Geological and producible reserves'. No reserve or rate figure.