Syrian Petroleum Company (الشركة السورية للبترول), website spc.sy: news and public tenders, 25 November 2025 to 27 September 2026
1 verbatim quotation from the cited document is withheld from this page. Follow the citation to read it at the source.
Source ID
SRC-750
Citation
Syrian Petroleum Company (الشركة السورية للبترول), website spc.sy: news and public tenders, 25 November 2025 to 27 September 2026
URL or path
https://spc.sy/ ; https://api.spc.sy/api (POST /News/public, POST /Tender/public); held research/CH9_ARCHIVE_2026-09-28/closing/spcsyria/live_news.json and spcsyria/live_pdf/
Type
Company website and its documents, live
Hierarchy tier
4
Published
2025-11-25 to 2026-09-27 (news); 2026 (tenders)
Accessed
2026-09-28
Snapshot
Live requests of 28 September 2026 recorded in research/CH9_ARCHIVE_2026-09-28/closing/spcsyria/; 90 tender pages read by text layer and 46 by OCR
Claims
CH9 v36 line 141 ('the Syrian Petroleum Company's current site, its news and its tender documents'; 'the current site adds targets and statements of single dates')
Status
READ
Version history
The register keeps changing after the book is fixed in print. Each entry below was added to this row in the order shown.
Verbatim: item 2046 (2 July 2026) 'يهدف المشروع إلى رفع إنتاج الحقول بنسبة 25% خلال الأشهر الستة الأولى وصولاً إلى 50% خلال العام الأول، بما يرفع الإنتاج إلى نحو 4 ملايين متر مكعب من الغاز يومياً'; item 2066 (4 August 2026) 'لرفع إنتاج الحقول تدريجيًا إلى نحو 250 ألف برميل يومياً بنهاية 2027'; item 2093 (17 September 2026) 'إعادة تشغيل عدد من المصافي ... بطاقة تصل إلى 35 ألف برميل يومياً'. Tender RFQ-06-26-010 fee basis 'a quantity of 200,000 barrels' of 'Daily Oil Production to be transported'; 'Tel Adas: 13 tanks (approx. 1.5 million barrels total)'. TARGETS AND SINGLE-DATE STATEMENTS, NO SERIES; no figure from this row is printed. spc-syria.com, named in a 2026 tender letterhead, redirected to spc.sy live on 28 September 2026 and its archived captures carry no figure.
Citation amended 29 September 2026 (make_works_cited refused process text): it read "[quotation withheld, 34 words; follow the citation]"; the API route, the item counts and the reading date stay here.