Sources

SRC-792

Gulfsands Petroleum plc, 'Reserves and Resources' page (Block 26), last modified 25 September 2026, reporting OPC's competent person's report dated 1 May 2026

Source ID
SRC-792
Citation
Gulfsands Petroleum plc, 'Reserves and Resources' page (Block 26), last modified 25 September 2026, reporting OPC's competent person's report dated 1 May 2026
URL or path
https://gulfsands.com/corporate/reserves-and-resources/; research/PART12_RECHECK_2026-10-16/gulfsands/corporate_reserves-and-resources.html
Type
Company's own website statement of its reserves, labelled as self-reported
Hierarchy tier
5
Published
2026-09-25 (dateModified)
Accessed
2026-10-16
Snapshot
Retrieved 16 October 2026, HTTP 200 (FETCH_RECORD section 6); page metadata 'modified_time' 2026-09-25T13:13:46+00:00; re-read 18 October 2026
Claims
CH9 l.51 (v40): the relabelling of the reserves columns; SRC-681
Status
READ

Version history

The register keeps changing after the book is fixed in print. Each entry below was added to this row in the order shown.

  1. READ AFTER THE CLOSING DATE OF 28 SEPTEMBER 2026, of a change made BEFORE it (D-307, OO-10). Compared with SRC-681's copy of 24 September 2026, the only change in the reserves section is the column heads of the Reserves table: '1C 2C 3C' then, '1P 2P 3P' now. The figures are unchanged: Reserves 47.1, 78.5, 121.4 MMboe; Contingent Resources, still headed 1C 2C 3C, 7.5, 26.9, 50.9 MMboe; Gulfsands net 50% working interest, as at 1 May 2026. The force majeure extension assumption is unchanged. This is the version that stood at the closing date; v39's sentence described the 3 July version without a reading date.
  2. LABEL LIFTED 18 October 2026 (closing pass 2, D-315; unit CL2-D): the reading is dated on or before the closing date of 18 October 2026 (D-315 item 1), so the prose keeps the reading date and drops 'after this book's closing date' (LABELS.md class A). Chapter 9 v42 l.51.