Damascus Governorate, 'بيان حول منطقتي المرسوم 66 "ماروتا وباسيليا سيتي"', statement of 5 May 2026, six pages, on its official Telegram channel; with SANA's reports of 5 May (the statement) and 6 May 2026 (the press conference)
Source ID
SRC-808
Citation
Damascus Governorate, 'بيان حول منطقتي المرسوم 66 "ماروتا وباسيليا سيتي"', statement of 5 May 2026, six pages, on its official Telegram channel; with SANA's reports of 5 May (the statement) and 6 May 2026 (the press conference)
URL or path
https://t.me/DamascusGov1/9216; research/CH4_CORRECTION_2026-10-16/tg/post_9216.html, post_9216_img1.jpg to _img6.jpg; SANA sana_locals_2468251.html (+ .txt) and sana_locals_2468739.html; Syria TV research/PART8_RECHECK_2026-10-16/syriatv_art06.html
Type
Official statement of a governorate (its own account, not an instrument)
Hierarchy tier
2
Published
2026-05-05
Accessed
2026-10-16
Snapshot
Post datetime 2026-05-05T18:41:18+00:00; SANA 2026-05-05T23:20:52+03:00 and 2026-05-06T17:16:30+03:00
Claims
CH4 v70, l.33 to l.39 (the paragraphs after l.29): the committee's failure, 'zoning not expropriation', the package (13.9 per cent; thirty-five times from 1 January 2026; the auction to be cancelled and the property sheet to be opened, announced [AMENDED 18 OCTOBER 2026 (RETEST_04_11_APX RT04-1) AND QUOTED: 'the auction cancelled and the property sheet']), those harmed including new owners; CR:CH4-MAROTA-001
Status
READ
Version history
The register keeps changing after the book is fixed in print. Each entry below was added to this row in the order shown.
READ AT THE SIX IMAGES 18 OCTOBER 2026. Page 2: 'إلا أنه لم يُكتب لهذه اللجنة النجاح والاستكمال'; 'إن " المرسوم 66 " هو مرسوم تنظيم وليس استملاك'. Page 3: 'إنّ المتضررين قد اتّسعت شرائحهم ... إلى المالكين الجدد وعددهم بالآلاف، إضافة إلى المقاولين وأصحاب الشركات الذين تعطلت التزاماتهم'. Page 4 item 1, 13.9 per cent of floor area 'بسبب تأخر تنفيذ المشروع'; item 2, rent allowance 35 times 'اعتباراً من 1/1/2026 م', annual totals 1,607,800,000 to 56,274,000,000 OLD Syrian pounds (NOT PRINTED: unreconciled with the press conference's one million to 35 million per beneficiary, SOURCE_PACK C13). Page 5 item 10, the auction of plot V192 to be cancelled and a property sheet to be opened (announced; no record of either act opened) [AMENDED 18 OCTOBER 2026, REVIEW_04 R04-1: the earlier wording 'the auction of plot V192 cancelled and a property sheet opened' printed announced measures as executed] for non-applicants pursued by security or 'بسبب إشارات مانعة'. Measures introduced 'تقرر لدى المحافظة الآتي'; no decision number, no law cited. Also not printed: 1,606 grievances and 1,122 resolved; 98 per cent average floor area (C14); 54 towers (C12); US$250 million of infrastructure. Press conference (SANA 6 May): 'وتشمل الزيادة حتى من قاموا ببيع ملكياتهم سابقاً'; the speaker, the governor's assistant for the technical sector, not named.
LABEL LIFTED 18 October 2026 (closing pass 2, D-315; unit CL2-D): the reading is dated on or before the closing date of 18 October 2026 (D-315 item 1), so the prose keeps the reading date and drops 'after this book's closing date' (LABELS.md class A). Chapter 4 v71 l.31 and l.33 (the transition's record of Decree 66, read 16 and 18 October 2026).