Sources

SRC-798

Al-Thawra (Damascus), 'تقرير نهائي للجان الكشف على الأبنية المتضررة بالزلزال' (A final report of the committees inspecting buildings damaged by the earthquake), 7 May 2023

2 verbatim quotations from the cited document are withheld from this page. Follow the citation to read them at the source.

Source ID
SRC-798
Citation
Al-Thawra (Damascus), 'تقرير نهائي للجان الكشف على الأبنية المتضررة بالزلزال' (A final report of the committees inspecting buildings damaged by the earthquake), 7 May 2023
URL or path
https://thawra.sy/local/%d8%aa%d9%82%d8%b1%d9%8a%d8%b1-%d9%86%d9%87%d8%a7%d8%a6%d9%8a-%d9%84%d9%84%d8%ac%d8%a7%d9%86-%d8%a7%d9%84%d9%83%d8%b4%d9%81-%d8%b9%d9%84%d9%89-%d8%a7%d9%84%d8%a3%d8%a8%d9%86%d9%8a%d8%a9-%d8%a7%d9%84/; held research/PART10_RECHECK_2026-10-16/web/thawra_2023-05-07_final_report_decision312.html
Type
Syrian daily newspaper report, Arabic
Hierarchy tier
3
Published
2023-05-07
Accessed
2026-10-16
Snapshot
Retrieved 16 October 2026 21:12:56 UTC by curl, HTTP 200, 212,341 bytes, SHA-256 prefix c9945d39652230a8 (research/PART10_RECHECK_2026-10-16/FETCH_RECORD.md section 3). datePublished 2023-05-07T20:37:40+03:00. Read whole, 16 and 18 October 2026.
Claims
Chapter 5 v80 l.231 (EQ-6); CH5-002
Status
READ

Version history

The register keeps changing after the book is fixed in print. Each entry below was added to this row in the order shown.

  1. READ AFTER THIS BOOK'S CLOSING DATE, on 16 October 2026; the prose dates it. Verbatim: [quotation withheld, 45 words; follow the citation] [quotation withheld, 18 words; follow the citation]. It also reports detailed reports for each building and that decisions would be proposed. NOTHING IN IT SAYS THE FINAL REPORT OR THE PER-BUILDING REPORTS WERE PUBLISHED: a report presented at a ministerial meeting is not publication, and CH5-002's bar stands. Decision No. 312 is not in the held 2023 Gazette index captures (issues 10 to 50 with gaps; issues 1 to 9 not held), per FETCH_RECORD section 4.
  2. 18 October 2026 (closing pass 2, CL2-C), R05-8 and LABELS #34: (1) the label lifts at the closing date of 18 October 2026; the reading of 16 October 2026 stays dated in the prose. (2) FOR 'issues 1 to 9 not held' READ: issue 9 parts one and two and the supplement to part one are held under 2022 titles at research/CH8_GAZ2022_2026-09-27/ (probe_ar_09_1_23.html, probe_ar_09_2_23.html, GAZ2022_i09_p1_slug.pdf) and were read on 18 October 2026; issues 1 to 8 run to 23 February 2023 and cannot print a decision of 27 February. (3) Decision 1698 of 27 February 2023 (Ministry of Public Works and Housing, engineers' fees after the earthquake) was found in the issue 9 supplement and is not Decision 312 (SRC-847).